There was a post on the sybase newgroups mobilink prior to them archiving them after SAP bought them. We may have a long binary larger than 2G based on data collection and there was a parameter that we need to change on the client and mobilink to allow synchronization not to fail since the largest buffer by default was 2G. I cannot find that now and searching through their new archive site is terrible.
thank you
thank you